OAKLAND SCHOOL - Main Contractor:  Hann Construction

New drainage to new buildings and renovations as well as upgrading and replacing existing drainage

Works included: 

  • installing and connecting new sewer pump station; 
  • new 300mm, 225mm and 150mm stormwater, approx 500m; 
  • new 63mm water main, approx 450m connected into new and existing buildings. Included installing a 50mm backflow prevention device connected to water main and new sub main, toby and meter in street; 
  • new type two and type one sumps; 
  • installing new 600mm and 1050mm access and inspection chambers as part of sewer and stormwater. 

 

Job duration: approx 18 months.

466 HAGLEY AVE - Main Contractor:  Williams Corporation

New drainage to 39 new 1 bedroom units

Works included: 

  • 100mm sewer, split into three lots each connected to it own council connection
  • 100mm storm water, two systems, one for roof water connected to street via three detention tanks and the other for ground water connect to street
  • 40 25mm water mains, one for each unit and one for irrigation
  • type 1 sumps 
  • trenching for power and communication cables

Job duration: approx 3 weeks